Let us help you search
Recommended Searches:
  • Price
  • Home Design
  • Before Service
  • After Service
  • Construction Standards
  • Price
  • Home Design
  • Before Service
  • After Service
  • Construction Standards
Price
Q

Why are the construction costs per square meter for PD House higher than that of other building companies?

A

When the details are carefully considered, it has been found that the materials used in the main living areas, pre- and post-sales and service and maintenance after the house is handed over to the customer, is significantly different. This is because our standard is higher so the cost of construction is higher too. We realize that homeowners need quality materials and exceptional pre- and post-sales and service so they are willing to pay more to get superior quality in return.

Q

Does the price shown on PD House’s website include everything for a fully constructed home? Are there any hidden costs?

Q

What is the definition of the term “construction costs”? What do they actually include?

Q

Are the payments for each installment the same amount?

Home Design
Q

Can a customer ask for a design modification?

Q

If a customer needs a new design, can you provide a new one and with or without additional cost?

Q

Can a customer bring his own home design and ask PD House to do build the home?

Q

How can we know that a design we choose is suitable for our land size?

Before Service
Q

What should be considered when choosing a building company?

Q

Is there a consulting fee required prior to the construction?

Q

If a home loan is needed, can the company contact the bank for a customer and is there any charge for this?

Q

What is the entrance price for a home constructed by PD House?

Q

If a home loan is needed, is the customer required to have additional funds and if so, how much is required?

Q

Does PD House remove an existing structure for the customer?

Q

Do other PD House offices or provincial offices build the same standard of home?

Q

Does PD House build homes in provincial areas?

Q

If a customer wants to build a home in a provincial area, do they have to pay for any additional transportation fees?

Q

What kind of home loan service is provided by PD House?

Q

Does PD House provide the service in Chachoengsao and which office should the customer contact?

Q

It is stated that building a 2–4-million-baht home will take 9-10 months to complete. What is the starting date of the contract?

After Service
Q

What are after-sales service or warranty PD House provides for customers?

Q

If the defects occur after the warranty period is over, will PD House come for a fixing?

Q

It is stated that the cost for water and electricity meters (temporary and permanent) is around 30,000 baht, does the owner have to pay for this?

Construction Standards
Q

Are changes permitted during home construction?

Q

What are the advantages and disadvantages of a Multi-joint Lock system compared to other prefab systems or cast-in-place structures?

Q

Why does PD House specify laminate instead of ceramic tile for the first floor? Will it cause any problems in the long run? What is the difference?

Q

Is it true that autoclaved concrete can reduce heat and sound from outside?

Q

Can the construction go on during the rainy season?

Q

What is the difference between environmentally friendly building material and general building material?